Oil & Gas Engineering Services
Shandong Deshi Petroleum Equipment Co., LTD
Back
Multi element thermal fluid oil displacement case
182 wells have been operated in Well Block H of Karamay Hongshan Oilfield, with a cumulative oil increase of 17372.9 tons;
85 wells were operated in the C well area of Xinjiang Oilfield, with a cumulative increase of 22995.5 tons of oil.
Contact Us
Add
No. 29, Qilianshan Road, Dongying District, Dongying City, Shandong Province
Tel
+86 546 8187518
Contact Email
dpec@deshigroup.com
